Please Sign In | Register
Google pluspinterestShare on Stumble UponShare on RedditFacebookShare on Tumblr
TITLE
LMS 14759 at Perth North, June 1936
EXTERNAL ID
PC_HRS_LOCOMOTIVES_008_518
PLACENAME
Perth
OLD COUNTY/PARISH
PERTH
DATE OF IMAGE
13 June 1936
PERIOD
1930s
SOURCE
Highland Railway Society
ASSET ID
25966
KEYWORDS
railway locomotives
Highland Railway locomotives
Highland Railway Society
HRS
LMS 14759 at Perth North, June 1936

Six 4-6-0 'River'class locomotives were ordered by the Highland Railway from Hawthorn Leslie. The first two (70 'River Ness'and 71 'River Tay') were delivered in September 1915 but it became immediately apparent that they were too heavy for the bridges and much of the track of the Highland Railway. These and the remaining four engines were sold to the Caledonian Railway where they were numbered 938 to 943. After 1923, the LMS strengthened the mainline between Inverness and Perth and so the locos did eventually work on Highland rails. The debacle surrounding the 'River'class caused the resignation of Frederick Smith as Chief Mechanical Engineer. He had held the post since 1912.

This photograph shows LMS 14759 (previously CR 941) at Perth North in June 1936. It was withdrawn from service in February 1939.

For guidance on the use of images and other content, please see the Terms and Conditions page.
High Life Highland is a company limited by guarantee registered in Scotland No. SC407011 and is a registered Scottish charity No. SC042593
Powered by Capture

LMS 14759 at Perth North, June 1936

PERTH

1930s

railway locomotives; Highland Railway locomotives; Highland Railway Society; HRS

Highland Railway Society

Highland Railway Society - Locomotives 4 (Smith classes)

Six 4-6-0 'River'class locomotives were ordered by the Highland Railway from Hawthorn Leslie. The first two (70 'River Ness'and 71 'River Tay') were delivered in September 1915 but it became immediately apparent that they were too heavy for the bridges and much of the track of the Highland Railway. These and the remaining four engines were sold to the Caledonian Railway where they were numbered 938 to 943. After 1923, the LMS strengthened the mainline between Inverness and Perth and so the locos did eventually work on Highland rails. The debacle surrounding the 'River'class caused the resignation of Frederick Smith as Chief Mechanical Engineer. He had held the post since 1912.<br /> <br /> This photograph shows LMS 14759 (previously CR 941) at Perth North in June 1936. It was withdrawn from service in February 1939.