Switch Gear at Nostie Bridge Power Station
EXTERNAL ID
GB232_RAMSAY_D893_1_16_011
PLACENAME
Nostie Bridge
DISTRICT
South West Ross
OLD COUNTY/PARISH
ROSS: Lochalsh
PERIOD
1990s
SOURCE
Skye and Lochalsh Archive Centre
ASSET ID
9245
KEYWORDS
hydro-electric
Nostie Bridge
switch gear
flooding
Switch Gear at Nostie Bridge Power Station

In July 1996 one of the main water pipes at the Nostie Bridge Power Station ruptured tearing up the ground outside, and causing flooding in the station. The whole system was shut down while cleaning, repair and replacement of machinery took place. This photograph shows the inside of the power station with the new switch gear installed. Supply was re-established in December 1997.

The North of Scotland Hydro-Electric Board was established under the Hydro-Electric Development (Scotland) Act 1943. Thomas Johnston presented the Act in the House of Commons, declaring that by harnessing 'the great latent power of the region' it would assist in remedying the ills that affected the Highlands. Johnston told the Commons that 'industries, whether owned nationally or privately, will be and ought to be, attracted to locations in the Highlands, as a result of this measure'.

Ordinary consumers would have priority, then the anticipated large power users, and any surplus energy would be sold to the national grid. Profits from these sales would help reduce distribution costs to more remote areas, and assist in carrying out measures for the economic development and social improvement of the Highlands. This famous social clause gave recognition that the Hydro Board was envisaged as an instrument for the rehabilitation of northern Scotland, not just an organization to provide electricity.

The output from the power station at Loch Sloy, west of Loch Lomond, was intended to meet the demand for central and western Scotland. The surplus energy produced here would be used to subsidise the Morar and Lochalsh projects, it being unlikely these smaller schemes could pay their way. The cost of construction of these three projects was estimated at £4,600,000.


This image can be purchased.
For further information about purchasing and prices please email
Skye and Lochalsh Archives

For guidance on the use of images and other content, please see the Terms and Conditions page.
High Life Highland is a company limited by guarantee registered in Scotland No. SC407011 and is a registered Scottish charity No. SC042593
Powered by Capture

Switch Gear at Nostie Bridge Power Station

ROSS: Lochalsh

1990s

hydro-electric; Nostie Bridge; switch gear; flooding

Skye and Lochalsh Archive Centre

William J Ramsay Archive

In July 1996 one of the main water pipes at the Nostie Bridge Power Station ruptured tearing up the ground outside, and causing flooding in the station. The whole system was shut down while cleaning, repair and replacement of machinery took place. This photograph shows the inside of the power station with the new switch gear installed. Supply was re-established in December 1997.<br /> <br /> The North of Scotland Hydro-Electric Board was established under the Hydro-Electric Development (Scotland) Act 1943. Thomas Johnston presented the Act in the House of Commons, declaring that by harnessing 'the great latent power of the region' it would assist in remedying the ills that affected the Highlands. Johnston told the Commons that 'industries, whether owned nationally or privately, will be and ought to be, attracted to locations in the Highlands, as a result of this measure'. <br /> <br /> Ordinary consumers would have priority, then the anticipated large power users, and any surplus energy would be sold to the national grid. Profits from these sales would help reduce distribution costs to more remote areas, and assist in carrying out measures for the economic development and social improvement of the Highlands. This famous social clause gave recognition that the Hydro Board was envisaged as an instrument for the rehabilitation of northern Scotland, not just an organization to provide electricity. <br /> <br /> The output from the power station at Loch Sloy, west of Loch Lomond, was intended to meet the demand for central and western Scotland. The surplus energy produced here would be used to subsidise the Morar and Lochalsh projects, it being unlikely these smaller schemes could pay their way. The cost of construction of these three projects was estimated at £4,600,000. <br /> <br /> <br /> This image can be purchased.<br /> For further information about purchasing and prices please email<br /> <a href= "mailto: skyeandlochalsh.archives@highlifehighland.com" >Skye and Lochalsh Archives</a><br />